Notice Is hereby given that City of York Council (the Council), in exercise of powers under Section 14(1) of the Road Traffic Regulation Act 1984 (the Act), made an Order on the 6* day of May 2021 in respect of the locations numbered (1), (2), (3) & (4). Additionally, the Council, not less than 7 days from the publication of this Notice, intends to make an Order under Section 14(1) of the Act in respect of the locations numbered (5), (6), (7), (8), (9), (10) & (11).

(11 STRAYLANDS GROVE. YORK This Order prohibits vehicles from proceeding in those lengths of road on Eastholme Drive, York Straylands Grove, York between the projected western-most boundary lines of property No's 1 and 7 (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 0900hrs and ending at 1600hrs on the 1st day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period.

(21 MARYGATE. YORK

This Order prohibits pedestrians from proceeding and waiting in (i) that length of footpath connecting Marygate Car Park and the riverside footpaths in front of Earlsborough Terrace between the railway line and No 14 Earlsborough Terrace (ii) that length of riverside footpaths (including Dame Judi Dench Walk) in front of Earlsborough Terrace, York between the western­most boundary of Marygate and No 14 Earlsborough Terrace and (iii) that length of riverside footpath connecting Marygate with Esplanade Court in front of property No's 13 - 18 Esplanade Court (closed footpaths) during the period when flood defence works are being undertaken thereon, commencing at 0001 hrs on the 1st day of June 2021 and ending at 2359hrs on the 16th day of December 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period. Additionally, parking suspensions will be in place on (a) the eastern side of Marygate, York between the riverside footpath and the junction between Hetherton Street and (b) the western side of Marygate between the projected south-western property boundary of Roots York and Hetherton Street, York (restricted road).

(31 ASKHAM LANE. YORK This Order prohibits vehicles from proceeding in those lengths of road on Askham Lane, York between the roundabout controlled junction with the A1237 York Ring Road and a location approximately 160 metres north of said roundabout (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 1900hrs on the 2nd day of June 2021 and ending at 0600hrs on the 3rd day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period.

(41 ATTERWITH LANE. YORK

This Order prohibits vehicles from proceeding in those lengths of road on Atterwith Lane, York between two points approximately 290 metres west of the junction with Mill lane and 450 metres east of the junction with Marston Lane (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 1930hrs on the 3rd day of June 2021 and ending at 0600hrs on the 5" day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period.

(51 HAXBY LEVEL CROSSINGS. HAXBY This Order will prohibit vehicles from proceeding through (i) Haxby Road Level Crossing, Haxby and (ii) Haxby Station Level Crossing, Towthorpe Road, York (closed road) during the period when track maintenance works are being undertaken thereon, commencing at 2330hrs on the 4th day of June 2021 and ending at 0600hrs on the 5th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

(61 ELVINGTON LANE. YORK

This Order will prohibit vehicles from proceeding in those lengths of road on Elvington Lane, York between a point approximately 100 metres north of the entrance drive to Derwent Nurseries and a point approximately 25 metres north of the entrance drive to Clock Farm (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 2000hrs on the 7th day of June 2021 and ending at 0500hrs on the 8th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

This Order will prohibit vehicles from proceeding in those lengths of road on Lendal, York between a location approximately 35 metres south east of the junction with Museum Street and a location approximately 50 metres north west of the junction with St Helen's Square (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 2230hrs on the 8th day of June 2021 and ending at 0500hrs on the 9th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

(81 BRADLEY LANE. RUFFORTH This Order will prohibit vehicles from proceeding in those lengths of road on Bradley Lane, Rufforth between the projected southern boundary of No 36 Bradley Lane and a point approximately 420 metres south of said projected boundary (closed road) during the period when road resurfacing works are being undertaken thereon, commencing at 1930hrs on the 10th day of June 2021 and ending at 0500hrs on the 11th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

(91 WIGGINTON ROAD LEVEL CROSSING. YORK This Order will prohibit vehicles from proceeding through the Wigginton Road Level Crossing, York (closed road) during the period when track maintenance works are being undertaken thereon, commencing at 2330hrs on 11th day of June 2021 and ending at 0600hrs on the 12th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

M01 WINDMILL LANE FOOTPATH. YORK This Order will prohibit vehicles from proceeding in those lengths public footpath connecting Church Lane-Hull Road (adjacent to Windmill Lane), York (closed footpath) during the period when road resurfacing works are being undertaken thereon, commencing at 0600hrs on the 7th day of June 2021 and ending at 2359hrs on the 21st day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period

(111 HESSAY LEVEL CROSSINGS. HESSAY

This Order will prohibit vehicles from proceeding through the Hessay Level Crossing on New Road, Hessay (closed road) during the period when track maintenance works are being undertaken thereon, commencing at 2320hrs on 7th day of June 2021 and ending at 0630hrs on the 8th day of June 2021 (works period) or at a time when the works have been completed whichever is the earlier. This is to ensure that the said works can be carried out safely. An alternative route for diverted vehicles will be signed during the works period The above temporary Orders will not prohibit works or emergency access nor will they prohibit access to premises provided that access is not prevented by on-going works or safety concerns. Traffic signs/barriers will indicate the extent of the prohibitions/restrictions. For further information please contact

highway.regulation@york.gov.uk



Director of Economy and Place

West Offices, Station Rise, YORK Y01 6GA

Attachments

BRA2099110.pdf Download

City of York Council

West Offices , Station Rise , York , YO1 6GA

http://www.york.gov.uk 01904 551 550

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices